Areas where sod has been added:
1) The completion of turf re-establishment on the #1 drainage project.
2) The completion of turf re-establishment on the #9 drainage project.
3) The completion of turf re-establishment on the #13 drainage project.
4) The area from which bentgrass sod was removed from the beginning of #11 fairway. This area is now restored but will remain rough grass.
5) The area of worn turf on the back left of #18 green bank.
#9 Drainage
#13 Drainage
#11 Tee End
#18 Green Bank