Saturday, April 13, 2013

Improvements

Over the last few weeks we have achieved quite a few different projects in regards to cart path edges.  Some areas have needed to be addressed because of drainage issues while others have been high traffic areas.  We would ask that even once these areas have rooted and re-opened, please keep ALL cart traffic off these areas.  These areas will only remain grassed as long as everyone does their part to keep them that way.

 Cart Path Edges At #15 Green And Approach
Before



During



After



  
Cart Path Edges At #3 Fairway
The following areas on the left side of #3 have been addressed in an effort to divert water to the left side of the path.  These areas would hold water all year long.  The result would be poor playability and unsightly ruts that even when fixed would quickly return the next time a cart went through.  A total of 24 yards of topsoil and 3 skids of sod were applied to these two areas.








 Cart Path Edges At #3 Green


 Cart Path Edges At #4 Tee

#1 Tee Landscaping Restoration Project
Before

During

After