The recent warm temperatures have allowed the Stillmeadow Turf and Maintenance crew, along with the help of a couple contractors, to complete a variety of task while continuing to keep the golf course playable. The following are pictures of the mentioned work in progress.
Stump Grinding
Bunker Drainage Work
Dead Ash Tree Removals
Last week we were able to install two much needed drainage systems. The first spot addressed was the usual wet spot to the left of the cart path across from 18(white) tee box. The other was the notorious wet spot in #2 fairway. We are excited to not have to deal with these two areas on a daily or weekly basis as well as the #2 fix adds the bonus of improved playability on that hole!
#18
#2
The following are some recent pictures of fall fertilizer applications as well as greens aeration: