Tuesday, October 27, 2015

Drainage Projects: 18 Tee Surround and 2 Fairway

Last week we were able to install two much needed drainage systems.  The first spot addressed was the usual wet spot to the left of the cart path across from 18(white) tee box.  The other was the notorious wet spot in #2 fairway.  We are excited to not have to deal with these two areas on a daily or weekly basis as well as the #2 fix adds the bonus of improved playability on that hole!

#18












#2



















Thursday, October 15, 2015

A Few Recent Pics

The following are some recent pictures of fall fertilizer applications as well as greens aeration: