Wednesday, September 18, 2013
Fall Aeration of Greens, Tees and Fairways
#13 Drainage Project (update)
We have installed surface catch drains that are tied into our existing sub-surface system. This should improve upon the duration of time required to drain these areas after a rain event.
Sunday, September 1, 2013
Drainage Project on #13
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)